ISSUE 116

 Return to the BUILD


“[In this issue,] add more details to the reactor platform of your DeLorean.”

Contents


Parts

Magazine

  • Drive Time: Model Instructions
  • The Animated Series: Animated Adventures
  • A Time Traveler’s Guide: Hill Valley Town Square (1955)

Build


Reactor Drum Cables

NOTE: I added these cables to my reactor back with Issue 114. If I were to add them now, I would change the installation order as follows:

Step 1

Push the pins on the right-angled ends of each Reactor Cable into these four holes at the rear of the Reactor Drum, as shown:

Step 2

Push the pins on the straight ends of two left-side Reactor Cables into these two rear holes of the left-side Mount, as shown. The cables should fit between the ‘fins’ of the Reactor Drum Details along the sides:

Step 3

In the same way, push the pins on the straight ends of two right-side Reactor Cables into these two rear holes of the right-side Mount:

Thoughts


These cables are a bit too long and should really be almost flush against the drum, but for me, it is close enough. The ends of the Reactor Cables are plastic with an elastic cord in between.

Running Total of screws used so far: 1070

Next Up


 Issue 117 – Reactor: Cables (Oil Separator Hoses)

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.